The objectives for the survey are:
- Evaluate the existing Lightning Protection System installation as per standard (IS/IEC 62305) and perform on-site tests to confirm the integrity of the system.
- Evaluation of existing LPS with needed improvement to retain the IEC 62305 requirements.
- Perform Risk Assessment of site as per IEC 62305-2:2010
- Selection of appropriate Lightning Protection Level and protection measures as per IS/IEC 62305.
- Survey of the structures for External Protection System designing as per IEC 62305-3.
- Study of electrical installation for Internal Lightning Protection System as per IEC 62305-4.
- Design and prepare Lightning Protection System and prepare Bill of Materials in accordance with IS/IEC 62305.
- Prepare safety measures for the protection of the contents of the buildings including electrical and electronic installations such as bonding, shielding, routing and SPD’s
- Prepare periodic maintenance schedule for Lightning Protection System.